Export
Turtle RDF/XML JSON-LD N-Triples

ssc4.4.1.cd determining process criteria indicators and resource availability unisri 24 25
ni

IRI: http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#SSC4.4.1.cd_DeterminingProcessCriteriaIndicatorsAndResourceAvailability_UNISRI_24_25

miiopr indicator
c) Quality targets are formulated based on SMART, have a baseline, target, and realization (%) that are monitored per semester through a performance dashboard and trend analysis for at least 3 years. d) The availability of resources is based on workload analysis, measured lecturer-to-student ratio, infrastructure adequacy index ≥95%), and periodic monitoring of budget realization.
en
None
url
https://drive.google.com/open?id=1r1eMuIByiIFz355BIiKrAxW9da1kdrJU&usp=drive_fs
https://drive.google.com/open?id=1MuibWty9j5BbRQjQv2GiJB97KyBcLfIc&usp=drive_fs
https://drive.google.com/open?id=1wztdK7jSS7_IbGD4KwV8t_Pbes0k6XYj&usp=drive_fs
miievidence type
Performance indicators documentation, monitoring and measurement methods Resource planning documents, infrastructure records, human resource records
en
miirequirement
c) Determine and apply the criteria and methods (including monitoring, measurement and related performance indicators) needed to ensure the effective operation and control of these processes. d) Determine the resources needed for these processes and ensure their availability
en
miicode
SSC4.4.1.cd
← Back to full documentation