Export
Turtle RDF/XML JSON-LD N-Triples

ssc6.1.1.a ensuring eomsachieves intended outcomes unisri 24 25
ni

IRI: http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#SSC6.1.1.a_EnsuringEOMSAchievesIntendedOutcomes_UNISRI_24_25

miievidence type
Risk management plans, performance monitoring reports, and process evaluation records
en
url
https://drive.google.com/open?id=17_nq8QGS0iwUS0Y3cGzPnhSzdpWlGDug&usp=drive_fs
https://docs.google.com/document/d/1s3TVt7JVcmXr54kOnegRI2spoOZY66Rq?rtpof=true&usp=drive_fs
miiopr indicator
The organization has determined the desired results of the SMOP which are described into specific and measurable objectives, complete with quantitative and qualitative performance indicators (KPIs), and supported by clear documentation evidence, including risk registers, monitoring reports, and evaluation of target achievements, so that achievements can be verified, objectively measured, and understood by all relevant parties
en
None
miicode
6.1.1.a
miirequirement
Give assurance that with an EOMS, the organization can achieve its intended outcome(s)
en
← Back to full documentation