Export
Turtle RDF/XML JSON-LD N-Triples

ssc8.1.1.d implementing process controls based on defined criteria unisri 24 25.
ni

IRI: http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#SSC8.1.1.d_ImplementingProcessControlsBasedOnDefinedCriteria_UNISRI_24_25.

miiopr indicator
The organization implements process control according to criteria through the evaluation of study results (GPA, on-time graduation, CPL achievements) and SPMI internal audits, with documented reports and follow-up on findings a maximum of 30 days after the audit.
en
None
miicode
8.1.1.d
url
https://drive.google.com/open?id=16iDZoHf5WHcYNLm2E64pvuj_DROrTxsC&usp=drive_fs
https://docs.google.com/spreadsheets/d/1QUmvT1rhWxRsi26qjPyX_-C33nDK6Hup?rtpof=true&usp=drive_fs
miirequirement
Implementing control of the processes in accordance with the criteria
en
miievidence type
Process monitoring records, internal audit reports, and performance evaluation records
en
← Back to full documentation